Checklist Items

1
All personnel notified of drill start time and procedures
Pass/Fail Required
2
Emergency alarm system activated and audible throughout facility
Pass/Fail Required
3
All exit routes clearly marked and unobstructed
Pass/Fail Required
4
Emergency lighting functioning properly
Pass/Fail Required
5
Total evacuation time from alarm to final headcount
Numeric Required
Max: 5 minutes
6
All personnel accounted for at designated assembly point
Pass/Fail Required
7
Floor wardens performed sweep of assigned areas
Pass/Fail Required
8
Visitors and contractors included in evacuation process
Pass/Fail Required
9
Elevator usage during evacuation
Multiple Choice Required
  • Elevators not used (stairs only)
  • Some personnel used elevators
10
Personnel with disabilities received appropriate assistance
Pass/Fail Required
11
Assembly point capacity adequate for all evacuees
Pass/Fail Required
12
Communication equipment functional at assembly point
Pass/Fail Required
13
Overall evacuation performance rating
Multiple Choice Required
  • Excellent - All objectives met
  • Satisfactory - Minor improvements needed
  • Needs Improvement - Training required
14
Drill coordinator signature and date
Signature Required
Items 14